More precisely we’ve lost our bridge and now the main road near our house. It was severely eroded from the flooded river after Irene and the edge continues to fall away.
The State has installed two traffic lights placed about a half mile apart to close the disappearing lane. Our car enters the road in the middle betwwn them so we have to guess which way traffic is flowing by looking at the backs of the traffic lights.
The good news is the new bridge work may begin tomorrow. Today’s food was brought over the river and through the woods by wheelbarrow.